Pequot Library open throughout Westway Road bridge construction

Pequot Library remains open throughout bridge construction that has temporarily closed Westway Road to through traffic and required temporary barricades at the intersection with Pequot Avenue.

The town said patrons may drive right through to access the library’s driveway.

The construction will last approximately three months and Pequot Library will remain open every day. Pequot apologizes for any inconvenience that patrons may experience from the bridge construction process.

About author

By participating in the comments section of this site you are agreeing to our Privacy Policy and User Agreement

© HAN Network. All rights reserved. Fairfield Sun, 1000 Bridgeport Avenue, Shelton, CT 06484

Designed by WPSHOWER

Powered by WordPress